Case Studies
QLD Health 1
Queensland Health Case Study Caboolture Hospital Case Study 1 Caboolture Hospital faced limitations in backup energy due to constraints on its existing Detroit 840kVA “black change” emergency generator. Velocity Energy was engaged to install a new Cummins 1400kVA generator, refit the existing generator control system for load sharing across both generators, ensure system reliability, and…
QLD Health 2
Queensland Health Case Study Caboolture Hospital Case Study 2 When Caboolture Hospital underwent a significant capacity expansion in 2011, they engaged Velocity Energy to upgrade the installation design and connection of their new Perkins 875kVA generator. What we did Project Outcome The final project will include installation, synchronisation with existing generators, and connection to the…