Queensland Health Case Study
Caboolture Hospital Case Study 1
Caboolture Hospital faced limitations in backup energy due to constraints on its existing Detroit 840kVA “black change” emergency generator.
Velocity Energy was engaged to install a new Cummins 1400kVA generator, refit the existing generator control system for load sharing across both generators, ensure system reliability, and conduct power interruption-free testing with the mains grid.
What we did
- Initial consulting:
By conducting a site visit and audit, we successfully addressed technical issues and greatly improved the reliability of the existing generator. - Designed, built and installed remote control interface:
We installed an advanced control solution to allow parallel operation testing and recovery of supply. - Design and installation of an aggregation, scheduling and dispatch system:
We provided a metering solution that enabled a revenue stream from connection to the grid. - Transition to bio-fuel:
We enabled both generators to transition safely to bio-fuel. - Connection to the grid:
We prepared and negotiated the Distribution Network Service Provider generator connection agreement with Energex. - Ongoing maintenance and testing:
We conduct regular maintenance and on-load testing to ensure the generators are 100% reliable and operating optimally all the time.
Project Outcome
100% reliable emergency power generation and an additional income stream.